> At 500 units, casting against machining depends on the part, and geometry decides more than quantity does. Machining removes material from solid stock and carries no tooling, so its cost per part barely moves with quantity. Casting carries tooling, forms the shape, and machines only the faces that have to be precise.

**Quick verdict.** Three statements cover most parts, and the third is the one buyers skip.

- **Machine it** when the quantity is low, the alloy cuts easily, or every surface is critical.

- **Cast it** when the geometry is awkward to cut, the volume justifies tooling, or the part is heavy in the middle.

- **The real question** is how many you will order over the life of the part, not how many you need now.

## What Does Each Process Start From?

Machining starts from solid stock and removes everything that is not the part. Casting starts from molten metal, forms most of the shape in one operation, and machines afterwards only where the drawing demands precision.

That difference in starting form is where the two cost structures split. A machined part is paid for mostly in spindle hours and material. A cast part is paid for partly in a tool that exists before the first part does.

Machining a custom part is usually Computer Numerical Control (CNC) work. Vector Components lists [CNC machining](https://vector-components.com/products-and-services/cnc-machining/) and casting, in die and investment form, among its products and services.

For customer-designed parts the main processes are CNC lathe, CNC mill, casting and wire Electrical Discharge Machining (EDM). Wire EDM belongs beside the other three because it cuts conductive metal with a travelling electrode rather than a cutting edge, which is how hardened steel and sharp internal corners get produced.

The cost of a machined part is set by how long the cutter stays in the material, how many setups the part needs, and how much metal leaves as chips. None of those three change much when the order quantity rises.

The cost of a cast part is set by the tool, the pour, the cleanup and the machining that follows. Only the first of those is fixed, and it is the one that makes quantity the deciding variable.

The two routes line up like this across the attributes that decide the choice.

| Attribute | Machining | Casting |
| --- | --- | --- |
| Starting form | Solid billet or bar | Molten metal |
| Tooling cost | None to low | Moderate to high |
| Cost per part at volume | Flat | Falls with quantity |
| Economic quantity | One upward | Above the tooling crossover |
| Material waste | High | Low |
| Internal cavities | Difficult | Straightforward |
| Tolerance as produced | Tight | Looser, machined after |
| Surface finish | Machined | As cast, then finished |
| Lead time, first part | Short | Longer, tooling first |
| Design change cost | Low | High once tooled |

## Where Is the Volume Crossover?

The volume crossover sits where casting's tooling charge, divided by the quantity, drops below the difference in cost per part between the two routes. That is arithmetic with three terms, and every one of them moves with the part.

No crossover quantity appears on this page, because no sourced figure holds across parts. The tooling charge follows the size and complexity of the tool. The per-part gap follows how much metal the cutter has to remove and how long the removal takes.

Work it as a total rather than a unit price. The machining route totals cycle time plus material, multiplied by the quantity. The casting route totals the tool once, plus the cast piece and its finishing operation, multiplied by the quantity.

As quantity rises, the tool divided by the quantity falls towards nothing, while the machining total climbs in a straight line. The two lines cross somewhere. Where they cross is the only honest form of the answer.

At 500 units the two lines are usually close enough that the part decides, which is why 500 is the quantity that produces the most arguments. A compact aluminium bracket with open faces may never reach its crossover at all. A large housing with a cored internal passage may have passed its own well before that quantity.

The quantity that belongs in the arithmetic is the lifetime quantity, not the order in front of you. Five hundred pieces once and five hundred pieces a year are different problems behind the same purchase order.

Buyers usually want the crossover as a single number. It exists for one drawing at a time, and two quotations settle it more cheaply than an estimate does.

## Which Geometries Change the Answer Outright?

Geometry settles the route before quantity is considered, because a cutter has to reach the surface it cuts. An enclosed cavity offers no approach, so machining one means splitting the part, cutting both halves and joining them again.

Casting carries no such constraint. Metal fills whatever the mould leaves empty, and an internal passage becomes a feature of the mould rather than an extra operation with a joint in it.

Thin webs between deep pockets are the second case. A long, slender cutter deflects under load, so the web has to be taken slowly, in several passes, with the tolerance held by the last light one.

Mass in the middle is the third. Machining removes everything that is not the part, so a hollow or heavily pocketed body can leave more of the billet on the floor than in the finished component.

The reverse case is just as clear. A part that is mostly flat faces, prismatic features and bores held to tight tolerance is a machining part, because casting it would buy a tool and then machine every surface anyway.

A complex stainless steel part with cored passages is a casting candidate on geometry alone. Which casting process suits it is a separate question, and that one turns on the mould rather than on the cutter.

The part that genuinely wants both processes has a lot of non-critical bulk and a few features that have to be in tolerance. Casting brings the bulk close, and a short machining operation finishes the features that carry the function.

## What Does the Alloy Decide?

The alloy on the drawing can decide the route on its own, because machinability and castability do not rank the same way. An alloy that cuts fast may cast poorly, and an alloy that pours well may be slow and hard on tooling.

Vector's CNC materials are aluminium, steel, stainless steel, zinc alloy, copper alloy and engineering plastics, with the grades listed on its CNC machining page.

Machining cost tracks cutting speed and tool life. Aluminium clears quickly. Stainless steel work-hardens, runs slower and wears tools faster, so the same geometry takes more spindle hours in 316L than it does in 6061.

That difference lands on the crossover rather than on the process. A slow-cutting alloy raises the machining route's cost per part without touching the tooling charge, which moves the crossover down. An easy-cutting alloy moves it up.

Castability is a different property list: fluidity, shrinkage, and whether the alloy fills a thin section before it freezes. Those govern what a mould can produce, not how fast a cutter can travel.

So the alloy reaches the answer from either direction. The same geometry can be a machining part in one material and a casting in another, at the identical quantity.

Which casting process suits which alloy is settled elsewhere, on the comparison between die casting and investment casting. For the cast-or-machine decision what matters is only how the alloy behaves under a cutter against how it behaves in a mould.

Put the alloy and the grade on the print rather than in a covering note. A quotation built from a drawing that does not name the material will move once the material arrives.

## What Do Schedule and Design Changes Decide?

Schedule and design maturity decide the route whenever the drawing is not yet frozen, because casting tooling is a physical object that has to exist before the first part does.

A machined first article needs stock, a fixture and a program. A cast first article needs a tool, which is itself machined, so the casting route starts behind and catches up only across quantity.

A tool also has a try-out stage of its own. First castings come back, dimensions are measured against the print, and the tool is corrected before any production run begins. That loop belongs in the schedule.

A change costs differently on each route. Editing a dimension on a machined part edits the program and the tool path. Editing the same dimension on a cast part means reworking the tool, replacing it, or accepting the geometry as it stands.

That asymmetry is why a design still under revision is often machined first and tooled later. The early parts cost more each and the changes cost almost nothing, which is the right trade while the drawing is still moving.

Standard parts behave differently from customer-designed ones. Vector's work divides into customer-designed parts, standard parts batch-made to exact specifications, and off-the-shelf parts sourced as a courtesy.

On standard parts made to specification, such as valves, fittings and [flanges](https://vector-components.com/products-and-services/flanges/), lead time is typically within two weeks. A custom part on either route carries its own schedule, and a cast one carries its tool ahead of it.

## Which Should You Quote First?

Quote both when the answer is close, because the drawing that feeds a machining quotation feeds a casting quotation, and neither quotation costs anything.

Work the decision in one order: geometry first, then alloy, then lifetime volume.

Geometry eliminates, because a feature no cutter can reach takes machining off the list. Alloy shifts the arithmetic without eliminating much. Volume chooses between whatever the first two questions leave standing.

The comparison is only honest when both quotations end at the same part. A casting quotation that stops at the raw casting is not comparable with a machining quotation for a finished component.

The casting route also carries more line items: a tool, a pour, cleanup, a finishing operation, and a handover between whoever performs the first and the second.

A factory that cannot perform the second operation places it elsewhere and adds a commission to the price, along with the quality and logistics problems that follow work crossing a boundary. None of that shows up as a line on the quotation.

Vector Components does not own or run a factory. It is the authorized representative of several leading Chinese manufacturers of industrial components, serving customers in the Canadian and United States markets under agreements that make Vector each factory's overseas sales department.

That bears on a cast-then-machined part in one specific way. Vector selects the manufacturer best suited to each part and process, and coordinates the transfer of parts between factories. A route that needs two factories needs somebody holding both ends of it.

Send Computer-Aided Design (CAD) drawings and specifications, and a quotation comes back within one business day. Quotes are free, and terms are NET 30.

Quote the part both ways once and the arithmetic stops being theoretical. Send us the drawing.

## Related Reading

- [Die Casting vs Investment Casting](https://vector-components.com/signals/comparisons/die-casting-vs-investment-casting)

- [Domestic Machine Shop vs Overseas CNC Supplier](https://vector-components.com/signals/comparisons/domestic-shop-vs-overseas-cnc)

- [Best Overseas CNC Machining Suppliers](https://vector-components.com/signals/listicles/cnc-machining-suppliers-for-north-american-manufacturers)

- [Factory Direct, Quote Portal or Authorized Representative](https://vector-components.com/signals/articles/authorized-representative-vs-factory-direct)